ST (Status) - Shows the status of an operator as follows:
     P - Operator is planned for work
     A - Operator is available.
     C - Operator is confirmed to a piece of
       work coming into the current location. The Arrive
       column on the Extra Board will display the planned
       arrival time. The Fresh Time for these operators has
       not been recalculated.